dafabet online sports betting
2024 Liaoning Province Expressway Traffic Management Facilities Maintenance and Renovation Project Aluminum Veneer、Aluminum Magnesium Manganese Plate、Curved surface painted aluminum veneer inquiry and purchase announcement
Source: Author: Release time: September 5, 2024 A+A-

  1. Purchasing conditions

This procurement project 2024 Liaoning Province Expressway Traffic Management Facilities Maintenance and Renovation Project Aluminum Veneer、Aluminum Magnesium Manganese Plate、Curved surface painted aluminum veneer inquiry and procurement project (hereinafter referred to as "this project"), the source of funds is Enterprise self-raised 100% , the purchaser of this project is Liaoning Datong Highway Engineering Co., Ltd. (hereinafter referred to as the "Purchaser"), the agency is China Consulting Overseas Consulting Co., Ltd. (hereinafter referred to as the "Agency")。This project has met the procurement conditions,We are now conducting domestic public inquiry and procurement for this project,And conduct post-qualification review of suppliers。

  2. Project Overview and Procurement Scope

2.1 Project Overview

The 2024 Liaoning Province Expressway Traffic Management Facilities Maintenance and Renovation Project mainly includes two parts: the toll canopy and the management station renovation。The renovation of paid awnings involves Benxi、Bianniu and Xiangshan three stations。The specific transformation content is as follows:

Benxi Toll Station: The original concrete canopy area is 388㎡、Steel structure awning area is 85㎡,Original 9 toll boat islands、Part of the original toll plaza’s semi-flexible pavement of 401㎡ will be completely demolished and rebuilt。The construction area of ​​the new awning is 1217.48㎡,Using reinforced concrete columns and flat grid roof structure。Benxi is known as the “Hometown of Maple Leafs”,The facade of the awning will adopt the maple leaf shape with local characteristics,The interior ceiling adopts wood-like aluminum profile grille,Giving people a warm and natural experience。The name of the awning station is aluminum plate with black paint and luminous characters、Fangzheng Xingkai、Font size is 3m*3m。The newly built mechanical and electrical facilities on Chuandao will meet dafabet best online casinothe existing needs。The lane is changed from entering 5 and exiting 8 to entering 4 and exiting 6,Provide convenience for more tourists to travel。New semi-flexible pavement 425㎡。

Bianniu Toll Station: The original concrete canopy area was demolished to 236㎡,Removal of the original steel structure awning 42.5㎡,New toll awning 707.37㎡。Demolish 5 original toll booths,2 additions to the island head,Removing 65㎡ of cement pavement,Remove 10㎡ of asphalt pavement,Restore cement concrete pavement 20㎡,Update mechanical and electrical facilities at the same time。

Xiangshan paid canopy: remove 238㎡ of the original concrete canopy roof,Remove 85㎡ of the original steel structure awning roof,New toll awning 748.25㎡,Demolish the side island at the entrance island of the toll plaza and build a new toll island,Demolish 31㎡ of road surface。Due to the existing problems such as insufficient clear height of the awning,The roof of the original house will be demolished to build an awning,Utilize the original structural frame columns and foundation,Changed from concrete roof to steel grid roof,And increase the height by 54 cm based on the original frame columns,To ensure that existing usage requirements are met。

The management station renovation part includes the original Xi management station office building、Benxi Toll Station Office Building、Renovation of the designation building and engineering building。The renovation content is: to meet the needs of use and achieve unified facade,Office building of original creek management station、Benxi Toll Station Office Building、The original flat roofs of the designation building and engineering building will be transformed into sloped roofs,Repair and water-in-sand spraying on the facade at the same time。The original Xi management station office building is to ensure the consistent style of the field,Pick out the area where the original building will be demolished,And perform facade restoration。The pedestrian bridge at Benxi Toll Station has safety hazards,Therefore updates will be synchronized。Renovation of sewage treatment facilities in Benxi Management Station area;Main cities in the province、The office buildings of 95 toll stations at the entrance and exit of the tourist area will be renovated,The main plan is to clean and repair dafabet online sports bettingthe tile surface and then repaint it with black topcoat。

Purchasing aluminum veneers according to project requirements、Aluminum magnesium manganese plates and curved painted aluminum veneers are used in the decoration construction of canopies and canopy columns。

  2.2 Procurement scope

The scope of this purchase is aluminum veneer for engineering construction、Aluminum Magnesium Manganese Plate、Supply of curved painted aluminum veneer materials、Transportation、Acceptance and Storage,Product after-sales service guarantee。

  2.3 Bidding segment division

This procurement is divided into 2 bids。The estimated purchase quantity is detailed in the table below:

31

  2.4Delivery cycle: from the signing of the contract to October 31, 2024 (the specific time is subject to the notice of the purchaser)。

  2.5Delivery location: Yuning Road, Mingshan District, Benxi City, Liaoning Province (the specific location shall be subject to the notice of the purchaser)。

  3. Supplier Qualification Conditions

  3.1 The qualification requirements that suppliers must possess for this inquiry and procurement are detailed in the table below:

32

3.2 This project Not accepted Consortium form bidding response.

3.3 Each supplier can have up to 2 Bidding response for 7297_7313 bids, and only transactions are allowed 1 bids.

  3.4 Units that have an interest in the purchaser and may affect the fairness of the purchase,Not allowed to participate in bidding response for this project;The person in charge of the unit is the same person or there is a controlling stake、Different units that manage relationships,Not allowed to participate in the bidding response for this project at the same time,Otherwise,None of the related responses are invalid。

  4. Obtaining procurement documents

  4.1 Any supplier interested in participating in the bidding response,Please use the electronic bidding and procurement platform of Liaoning Communications Construction Investment Group (hereinafter referred to as "Liaoning Communications Investment Electronic Bidding and Procurement Platform",Website: # ) to register.

  4.2 After completing the registration, please go to 2024 Year 9 month 6 Today at 00:00 2024 Year 9 month 9 Sunday 23:59,(Beijing time,The same below),Log in to "Liaoning Communications Investment Electronic Bidding and Procurement Platform",Download procurement documents by bid section dafabet live casino(for specific operations, please refer to "Liaoning Communications Investment Electronic Bidding and Procurement Platform" - Help Center - Procurement (Procurement) Document Download Guide),No charge for downloading purchasing documents。

Failure to download procurement documents from the "Liaoning Communications Investment Electronic Bidding and Procurement Platform" as required,The purchaser refuses to accept the response document。

  5. Submission of response documents and related matters

  5.1 The response file should be an encrypted response file。Deadline for submission of response documents (bidding deadline,The same below) is 2024 Year 9 month 13 日 14 hour 00 Points.

  5.2 Suppliers should submit response documents before the deadline,Log in to "Liaoning Communications Investment Electronic Bidding and Procurement Platform",Clear the bidding segment,Submit encrypted electronic response documents according to the bidding segments,The response file needs to be uploaded through the CA digital certificate,There is no need to submit paper response documents for each bid section of this project。(Note: The supplier uploads the response file for the bid it responds to),The corresponding bid section procurement document should be downloaded during the procurement document download period,Otherwise the bid response file will not be uploaded。)

After the supplier completes uploading the response file,"Liaoning Communications Electronic Bidding and Procurement Platform" immediately issues electronic receipt vouchers to suppliers,The submission time shall be subject to the transmission completion time stated on the electronic receipt voucher。Response files that have not been uploaded after the due date or are not encrypted as required,Purchaser refuses to accept。

  5.3 The response document should be prepared through the "Liaoning Communications Investment Response Document Preparation Tool"。For details on the preparation tools and operating procedures, please see the portal ("Liaoning Communications Investment Electronic Bidding and Procurement Platform"—Help Center—Tool Download/Operation Manual)。

  5.4 Preparation of response files、Online submission、A CA digital certificate is required to open the response file and other steps。For details of the CA digital certificate application process, please see the portal ("Liaoning Communications Investment Electronic Bidding and Procurement Platform"—Help Center—CA Application)。

  5.5 Suppliers prepare electronic equipment by dafabet live casinothemselves,And ensure smooth network connection,Online decryption of response files within the specified time。

  6. Evaluation Method

This project evaluation method adopts (lowest price method),For details on the evaluation standards and methods, please refer to the procurement documents。

  7. Media for publishing announcements

This procurement announcement is also on the "Liaoning Provincial Communications Construction Investment Group Co., Ltd. website" ()、"Liaoning Provincial Communications Construction Investment Group Electronic Bidding and Procurement Platform" (#)、"China Tendering and Bidding Public Service Platform" (http://www.cebpubservice.com)。

  8. Contact information

   Purchase Person: Liaoning Datong Highway Engineering Co., Ltd.

地    Address: No. 1, Herong Road, Sujiatun District, Shenyang

lian Department Person: Mr. Duan

Electricity    Call: 13840351763

Purchasing agent: China Consulting Overseas Consulting Co., Ltd.

地    Address: Floor 4-5, Building 1, No. 25 Chegongzhuang West Road, Haidian District, Beijing

lian Department Person: Mr. Deng, Mr. Li, Ms. Chen

Electricity    Call: 024-88325378

网    Address: https://zzhw.ciecc.com.cn

Post    Box:zzhwzh01@126.com

dafabet best online betting website

Contact us

dafabet best online casino
024-67856789

lnsjtjt@126.com

No. 42-2, Lidao Road, Heping District, Shenyang City, Liaoning Province